AdrianCappellaRamirez

Field engineer

Civil, structural and architectural

I walk installed work against the design, write up what doesn't match, and stay on it with the contractors until the system is ready to turn over.

Fluor / Construction Engineer III

Master of Construction Science and Management, Clemson University. Civil Engineering, Universidad Latina de Costa Rica. Native Spanish, fluent English.

6years on active sites
$5Bproject I'm on now
2countries, USA and Costa Rica
0serious injuries on my crews

Six years on site

Pick a role on the schedule to see the projects from it.

Showing all 6 projects

Novelis Goldeneye aluminum mill

Fluor / Bay Minette, Alabama / Dec 2025 to present

  • $5B facility
  • About 100 acres
  • 600 kt a year
  • First fully integrated U.S. aluminum mill in 40 years
Novelis: about the Bay Minette plant
  • Walk installed civil, structural, architectural and HVAC work against the drawings in electrical rooms, hydraulic rooms, slabs on grade and furnace foundations.
  • Raise each deficiency against the contractor responsible with a category and a required-by date, and follow it until it's closed.
  • Work the turnover process by subsystem, from subsystem creation through engineering books, Notices of Completion and the client turnover packages.
  • Built the subsystem turnover skyline and a dashboard the engineering manager uses to see accepted and late subsystems and open punch in one place.

AEP Rockport combined-cycle power

Fluor / Rockport, Indiana

  • Feasibility and FEED
  • Power generation
  • Built the construction trackers that reported 10 to 15 KPIs to the project manager every week.
  • Prepared site visit and turnover reports for the Rockport, Indiana and Ocotillo, Arizona sites during my internship.

Bayer pharmaceutical plant

Proycon / Coyol Free Zone, Costa Rica

  • 301,000 sq ft facility
  • $200M owner investment
  • GMP cleanrooms
  • Lead engineer
CINDE: Bayer's plant in Coyol Free Zone
  • Supervised construction of the GMP cleanrooms and coordinated the mechanical, electrical and plumbing trades through certification.
  • Ran design-review meetings with the owner and designers on scope, change orders and constructability.
  • Ran the subcontractor meetings with the Last Planner System and built the schedules the trades worked from.

Heraeus Medevio, Phases II and III

Proycon / La Lima Free Zone, Cartago, Costa Rica

  • Phase III: 131,000 sq ft
  • Two stories, precast concrete
  • ISO 8 cleanrooms
  • Bandera Azul Ecológica
CINDE: Heraeus Medevio Phase III
  • Owned inspection, drawing review, punch lists and delivery through turnover to the owner.
  • Led two to three engineers and handled all project permits.
  • Ran the fire water tank excavation shown in the next section.

AE-402 apartment tower

Bilco / Escazú, Costa Rica

  • 13 stories
  • 119,000 sq ft
  • Post-tensioned slabs
  • Residential
  • Ran inspection and drawing review from planning through construction and owned the material supply chain.
  • Helped bring in the Last Planner System and improved crew and equipment scheduling to cut idle time.

Habla Seguro (Talk Safety)

Clemson University / Research with Dr. Shima Clarke

  • 60 construction users tested
  • 2 peer-reviewed ASC papers
  • Built a bilingual safety phrase app that helps English and Spanish speaking crews talk to each other on site.
  • Designed and delivered safety training in both languages on jobsite hazards and OSHA compliance.

A cut that started to move

Fire water tank excavation, Heraeus Medevio. Step through what happened and what we did.

Cross-section of the fire water tank excavation A 23 foot deep excavation beside a gabion wall, with the water table about 3 feet below grade. Layers show cracks in the soil, the slide, concrete backfill, steel bracing beams and precast wall panels. GABION WALL WATER TABLE 3 FT DOWN 23 FT GRAVEL PILES PUMPS, 24/7 STOP WORK SLIDE 33 CU YD CONCRETE STEEL BRACING PRECAST PANEL, SET BY CRANE
Original diagram, not to scale
Step 1 of 5
  1. A 23 ft deep, near-vertical cut beside a gabion wall, with the water table about 3 ft down. Pumps ran around the clock and gravel piles sat under the tank footprint.

  2. When cracks showed in the soil at the cut, we stopped work and got everyone out until we had a plan.

  3. It moved at the third support panel, with nobody in the excavation.

  4. Backfill and about 33 cubic yards of concrete behind the cut, then steel beams across the top.

  5. We built the affected walls in precast panels set by crane, so we could keep people out of the cut. What I took from it: check constructability while the budget is being built, and use sheet piles or equivalent shoring past about 16 ft.

How a subsystem gets turned over

Most of my week at Fluor goes into this sequence. I work each step and keep every subsystem's status where the engineering manager can see it.

  1. Subsystem creationScope, boundaries and the contractor responsible.
  2. Remaining activitiesWalkdowns, punch items and follow-up until they close.
  3. Engineering booksDossiers reviewed and approved.
  4. Notice of CompletionThe contractor's work is formally complete.
  5. Client turnover packagePrepared and delivered to the owner.

Tools I built for the field

I'm a construction engineer, not a software developer. I built these with Claude outside my Fluor role, for real jobsite use. In each one the AI reads or drafts and an engineer reviews.

  • FieldPunch

    Punch list app for walkdowns. Pin the deficiency on the drawing, attach photos, and export in the completions database load format.

  • Dossier Verifier

    Checks scanned engineering books before they go to the client. The AI reads the documents and a fixed set of rules decides pass or fail.

  • RFI Responder

    Drafts civil, structural and architectural RFI responses from the drawings and specs for an engineer to review.

  • CivilCheck

    Compares installed quantities against design quantities and flags variances before progress reporting.

  • Construct Daily Flow

    Send an audio note from the field and get a formatted daily report. Weekly and monthly reports build from the daily entries.

  • BIM dashboards

    Revit and IFC models in dashboards tied to the schedule (4D) and the budget (5D).

In six years, nobody on my crews has been seriously hurt.

That comes from planning the work, listening to the people doing it, and stopping when something doesn't look right.

Publications and credentials

ASC 2026. Cappella, Clarke, Lucas and Burgett. Designing and Testing an App for Construction Spanish Safety Communication on Construction Jobsites. EPiC Series in Built Environment, vol. 7, pp. 625 to 633.

ASC 2025. Cappella, Clarke and Lucas. A Review of Apps for Construction Spanish Safety Communication on Construction Jobsites. ASC 61st Annual International Conference.

  • FAA Part 107
  • Texas Tech Project Management Specialization
  • PMP in progress, exam planned April 2027
  • Autodesk Revit
  • Primavera P6
  • Bluebeam Revu
  • Navisworks